Every scheduling page draws from one list: jobs that have no scheduled date yet. Drag a job out of that list onto a technician and it is scheduled; the other three views see it immediately. Pick the view that matches the question you are asking. "Who is free at nine tomorrow?" is a Dispatch question. "Can we absorb next week's contract work?" is a Team Scheduling question. "Where is the quiet week this month?" is the calendar. "What is the shortest way to cover all of it?" is the Routing Workbench.
Scheduling
Open Scheduling- Geography on the board. The map and the grid are the same day, so a job is placed by where it is, not just when.
- Drag, and it is scheduled. Dropping a job onto a technician's row sets the date, the time and the assignee in one motion and moves the job from Pending to Scheduled.
- The pending list is filtered the way you work. One office, one metro, one priority, and the panel shows only what you are placing today.
Team Scheduling
Open Team Scheduling- The week in one glance. Light days and heavy days are visible side by side, so work can be moved to balance them.
- Per technician, per day. A row per person shows who is loaded and who has room, across the whole week.
- Same pending list, same drag. Nothing new to learn after Dispatch; only the horizon changes.
Monthly Schedule
Open Monthly Schedule- The month's shape. Which weeks are full and which are open, before anything is placed.
- Assign on drop. The popover asks for technician and time at the moment of placement, so a day-level plan still lands as a real appointment.
- Filter by technician. See one person's month to find the gap that fits a long job.
Routing Workbench
Open Routing Workbench- Drive time becomes a number. The savings figure is on screen before anything is committed.
- Nothing is saved until you publish. Solve, pin, re-solve and compare, then publish the plan you like.
- Senior people kept for senior work. Senior Preservation holds your most capable technicians free for the jobs only they are qualified to do.
- Existing appointments are respected. Jobs already on a calendar appear greyed as Already Scheduled: they keep their times, count toward capacity and driving, and are never moved.
Where to go next
- The Routing Workbench can only place a job on a technician whose capabilities cover it. Capabilities are maintained under Technician Capabilities, and where each technician's day starts and ends under Work Day Locations. An empty grid there means the router places nothing, which is correct rather than broken.
- For whether the team has the hours for the months ahead, see Workload & Capacity under Analytics. Its supply line is the same work-week and PTO model the router uses.
- For contract occurrences that are inside their lead time with no job yet, see the Obligations Calendar.
Good to know
- Pending means no scheduled date. All four views feed from jobs with no scheduled date. Scheduling one on any view removes it from the pending list on all of them.
- Publishing a plan flips Pending to Scheduled, the same status change Dispatch makes when you drag a job onto a technician.
- Completed and cancelled jobs are not obstacles. They keep their date and assignee for the record but take up no room on any board.
- A job that needs more than one day is not routed. The workbench leaves it unplaced with an Exceeds One Day reason; place it by hand on Team or Monthly Scheduling.
- A technician with an early fixed job still gets new work. An existing 8:00 appointment no longer blocks the rest of that technician's day in the router.